Commelle-Vernay. Closing of the Villerest bridge from March 31 to April 2

The repair of the road of the Villerest bridge (to the right of the Chiaverina quarry) will be carried out from Wednesday, March 31 to Friday, April 2.

The bridge will be closed to traffic during this period; a detour will be established for RD 18 (dam bridge).

Back to top button